首页> 外国专利> ECOGEOTECHNOLOGICAL METHOD OF REPEATED UNDERGROUND DEVELOPMENT OF TECHNOGENIC GRAVEL DEPOSITS OF PERMAFROST ZONE

ECOGEOTECHNOLOGICAL METHOD OF REPEATED UNDERGROUND DEVELOPMENT OF TECHNOGENIC GRAVEL DEPOSITS OF PERMAFROST ZONE

机译:多年冻土带技术碎屑矿床重复地下开发的生态地球技术方法

摘要

FIELD: mining.;SUBSTANCE: ecogeotechnological method of repeated underground development of technogenic gravel deposits of permafrost zone involves performance of stripping and mining operations during winter season. Pre-worked out area of earlier developed gravel borehole is reinforced with chain ice pillars erected parallel to those left during primary development of deposit. After that, development of technogenic pillar sands is performed. At that, in order to prevent caving in the ground surface, recovery of the relief and integrity of rock mass disturbed with mining operations, the whole worked-out area is filled with sand-and-stone material.;EFFECT: providing safety of mining operations, reducing volumes of dumps arranged on ground surface, preventing caving of ground surface within the limits of mine field, and recovery of relief and integrity of mine rock.;1 dwg
机译:领域:采矿;物质:多年冻土带技术碎石沉积物的地下重复开发的生态地球技术方法涉及冬季的剥离和采矿作业。较早开发的砾石钻孔的预加工区域通过链冰柱加固,该链冰柱平行于沉积物初步开发过程中留下的链冰柱。之后,进行技术性柱砂的开发。那时,为了防止在地表中塌陷,恢复受采矿作业干扰的岩体的完整性和完整性,整个开采区域都充满了沙石材料。效果:提供采矿安全性作业,减少排在地面上的排土场的体积,防止在矿场范围内塌落地面,并恢复矿山的浮雕和完整性.1 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号