首页>
外国专利>
Method for prevention of setting phase of concrete with local concrete piles at pile head, involves bringing additive or displacement body to fresh concrete of pile head
Method for prevention of setting phase of concrete with local concrete piles at pile head, involves bringing additive or displacement body to fresh concrete of pile head
展开▼
机译:防止桩头局部混凝土桩凝结混凝土的方法,包括将添加剂或置换体带入桩头的新鲜混凝土中
展开▼
页面导航
摘要
著录项
相似文献
摘要
The method involves bringing an additive or displacement body to the fresh concrete of a pile head. The additive is mechanically or manually mixed under the concrete. The displacement body is mechanically or manually brought to the fresh concrete of the pile head.
展开▼