首页> 外国专利> CONSTRUCTION METHOD FOR UNDERGROUND STRUCTURE, AND PILE HEAD STRUCTURE OF TEMPORARY INTERMEDIATE PILE

CONSTRUCTION METHOD FOR UNDERGROUND STRUCTURE, AND PILE HEAD STRUCTURE OF TEMPORARY INTERMEDIATE PILE

机译:地下结构的施工方法及临时中间桩的桩头结构

摘要

PROBLEM TO BE SOLVED: To provide a construction method for an underground structure, which can shorten a construction period when the underground structure is constructed by an inverted lining method, and a pile head structure of a temporary intermediate pile.SOLUTION: A construction method for an underground structure comprises: a pile arrangement step of arranging a temporary intermediate pile M in the ground; a first skeleton construction step of forming a first skeleton A above the temporary intermediate pile M; an excavation step of digging down the ground on the downside of the first skeleton A; a second skeleton construction step of forming a second skeleton B on the downside of the first skeleton A; and a third skeleton construction step of forming an intermediate wall C between the first and second skeletons A and B. In the third skeleton construction step, the intermediate wall C is formed in the state of winding in the temporary intermediate pile M.
机译:要解决的问题:提供一种地下结构的施工方法,该方法可以缩短采用倒衬法施工地下结构时的施工时间,以及临时中间桩的桩头结构。地下结构包括:桩布置步骤,将临时中间桩M布置在地面中;第一骨架施工步骤,在临时中间桩M上方形成第一骨架A。在第一骨架A的下方挖地面的挖掘步骤;第二骨架构造步骤,在第一骨架A的下方形成第二骨架B。在第三骨架构造步骤中,中间壁C以缠绕的状态形成在临时中间桩M中;第三骨架构造步骤在第一骨架A和第二骨架B之间形成中间壁C。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号