Reservation schedule optimization apparatus and reservation schedule optimization method
展开▼
机译:预约时间表优化装置和预约时间表优化方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To optimize a schedule reservation plan implemented on an application according to an actual task.;SOLUTION: A reservation schedule optimization device 100 is provided with a first rearrangement means 1 for grouping reservation schedules whose reservation times are close, and for performing first rearrangement in the order of the early reservation time in the group; a first rearrangement storage device 6 for storing the result of the first rearrangement; an empty block extraction means 2 for extracting an empty block generated by the first rearrangement means; an additional reservation block extraction means 3 for extracting the number of blocks and insertion position of a reservation plate to be added; a decision means 4 for deciding whether or not the reservation plate to be added can be inserted; and a second rearrangement means 5 for arranging the reservation plate to be added at the insertion position in the empty block where it is decided that the reservation plate can be inserted, and for performing second rearrangement in the order of the early reservation time.;COPYRIGHT: (C)2007,JPO&INPIT
展开▼