Enterprise project management system and method therefor
Enterprise project management system and method therefor
展开▼
机译:企业项目管理系统及其方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
A project management system uses a work breakdown structure to define the project tasks. The work breakdown structure is organized as set of hierarchical related project tasks. The work breakdown structure can be loaded in part from a template. A calendar breakdown structure defines events associated with project resources. The calendar breakdown structure is defined on departmental basis. A resource breakdown structure defines available resources. The resource breakdown structure includes personnel and tools. The allocation of available resources to the project tasks is optimized within the constraints of the work breakdown structure and calendar breakdown structure. A histogram of project demand versus available resources is generated. The histogram of project demand versus available resources is used to optimize resource allocation.