首页> 外国专利> Method and system for switching to an engineering signal processing system from a production signal processing system

Method and system for switching to an engineering signal processing system from a production signal processing system

机译:从生产信号处理系统切换到工程信号处理系统的方法和系统

摘要

A system and method for transitioning to a back-up or engineering signal processing system includes a remote facility having multiplexers and a primary signal processing system generating a first output signal, an IP network, and a plurality of local collection facilities generating a plurality of channel signals through a plurality of receiving circuit modules having respective encoders encoding the plurality of channel signals into a plurality of encoded signals. The plurality of local collection facilities communicating the plurality of encoded signals to the remote facility having a first signal processing system through the network. A first compression system controller is associated with the remote facility storing first configuration data for monitoring and controlling the plurality of receiving circuit modules and the multiplexers. An engineering compression system controller has an engineering signal processing system. The first compression system controller communicates the first configuration data to the engineering compression system controller. The engineering compression system controller configures the engineering signal processing system with the first configuration data. A router associated with the plurality of receiving circuit modules routing the plurality of encoded signals to the engineering signal processing system. The engineering signal processing system generates a second output signal from the plurality encoded signal. The first signal processing system discontinues generating the first output signal.
机译:一种用于过渡到备份或工程信号处理系统的系统和方法,包括具有多路复用器的远程设备和生成第一输出信号的主信号处理系统,IP网络以及生成多个信道的多个本地收集设备信号通过具有各自编码器的多个接收电路模块进行编码,这些编码器将多个信道信号编码为多个编码信号。多个本地收集设施通过网络将多个编码信号传送到具有第一信号处理系统的远程设施。第一压缩系统控制器与远程设备相关联,该远程压缩设备存储用于监视和控制多个接收电路模块和多路复用器的第一配置数据。工程压缩系统控制器具有工程信号处理系统。第一压缩系统控制器将第一配置数据传送到工程压缩系统控制器。工程压缩系统控制器利用第一配置数据来配置工程信号处理系统。与多个接收电路模块相关联的路由器将多个编码信号路由到工程信号处理系统。工程信号处理系统从多个编码信号生成第二输出信号。第一信号处理系统停止产生第一输出信号。

著录项

  • 公开/公告号US8072874B2

    专利类型

  • 公开/公告日2011-12-06

    原文格式PDF

  • 申请/专利权人 HOANG D. PHAM;JEANET C. MIKA;

    申请/专利号US20070853740

  • 发明设计人 HOANG D. PHAM;JEANET C. MIKA;

    申请日2007-09-11

  • 分类号H04J3/04;H04H20/28;

  • 国家 US

  • 入库时间 2022-08-21 17:25:40

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号