首页> 外国专利> UNDERGROUND MINING WORKS

UNDERGROUND MINING WORKS

机译:地下采矿工程

摘要

When developing an underground mine, the shaft (80) of the mines is created by removing the soil and removing the excavated rock from the shaft (80) of the mine using a rock transportation system containing skips (36) moving up and down along the skip guides in the shaft. Tunnels (82) begin to construct mines from the lower part of the shaft (80) with a recess of the cavity (81), in which the drilling tunnel tunneling machine (82) is assembled and operated. When excavating a tunnel, the rock is transported from the tunnels via a conveyor (87) to the rock transportation system installed in the shaft of the mine during its creation and transporting the rock to the ground surface area.
机译:当开发地下矿井时,使用包含沿船体上下移动的skip斗(36)的岩石运输系统,通过去除土壤并从矿井(80)中除去挖掘的岩石来创建矿井(80)。跳过轴中的导轨。隧道(82)开始从竖井(80)的下部构造具有腔(81)的凹部的矿,在其中组装并操作钻孔隧道掘进机(82)。在开挖隧道时,岩石在形成过程中通过输送机(87)从隧道输送到安装在矿井中的岩石输送系统,并将岩石输送到地面。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号