首页> 外国专利> METHOD FOR MANAGING CHANNELING IN GEOTHERMAL RECOVERY OF HYDROCARBON RESERVOIRS.

METHOD FOR MANAGING CHANNELING IN GEOTHERMAL RECOVERY OF HYDROCARBON RESERVOIRS.

机译:油气藏地热采收中管理通道的方法。

摘要

High permeability channels or wormholes found in hydrocarbon reservoirs having hydrocarbon-bearing formations can be remediated by heating the formation with dry, hot flue gases, injecting produced water into the formation through an injection well, and forming steam within the formation and spaced away from the injection well. The steam can be created at a steam generation interface occurring between a dry, hot gaseous drive front and an injected water front. Managing a quality of the steam formed along the steam generation interface, by increasing the combustion gas flow rate or decreasing the rate of water injection, allows for the initiation of precipitation and controlled deposition of solids dissolved in the produced water.
机译:通过用干燥的热烟道气加热地层,通过注入井将采出的水注入地层中,并在地层中形成蒸汽并与地层隔开一定距离,可以补救在具有含烃地层的碳氢化合物储层中发现的高渗透率通道或虫洞。注射好。可以在干燥的热气态驱动前沿和注入水前沿之间产生的蒸汽产生界面处产生蒸汽。通过增加燃烧气体的流量或减少注水的速率来管理沿着蒸汽产生界面形成的蒸汽的质量,可以开始沉淀并控制溶解在采出水中的固体的沉积。

著录项

  • 公开/公告号MX2012003728A

    专利类型

  • 公开/公告日2012-10-01

    原文格式PDF

  • 申请/专利权人 RESOURCE INNOVATIONS INC.;

    申请/专利号MX20120003728

  • 发明设计人 FRED SCHNEIDER;LYNN P. TESSIER;

    申请日2012-03-28

  • 分类号C01B3/00;E21B7/00;

  • 国家 MX

  • 入库时间 2022-08-21 17:23:43

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号