首页> 外国专利> METHOD FOR PROVIDING A WATER TOWER, AND WATER TOWER.

METHOD FOR PROVIDING A WATER TOWER, AND WATER TOWER.

机译:提供水塔的方法和水塔。

摘要

Method for the construction of a water tower (1) made of reinforced concrete comprising a bed (2), a raised tank (3), and a shaft (5) to support the tank (3) above the bed (2) ; the method comprising the steps of: providing the bed (2) on the floor; complete the tank (3) above the bed (2) and at the top of a formwork (9) for the formation of the shaft (5), which comprises a removable annular reinforcement (8) having an internal section identical to that of the shaft (5) to be formed and of a smaller height than the shaft itself (5), connection means (21, 22) that extend between the frame (8) and the tank (3) to make the armor (8) and the tank (3) are fixed with respect to each other, and a plurality of hydraulic jacks (14) distributed around the armature (8) and each comprising a top mobile wand (16), a foot (17) lower tubular, and resting means (18) coupled to the tubular foot (17); perform a first casting of a first segment (28) of the shaft (5) defined by the frame (8) kept in contact with the bed (2) and covers the tubular feet (17) of the hydraulic jacks (14); move the moving rods (16) of the hydraulic jacks (14) upwards from an initially retracted position to an extracted position, thus determining the lifting of the tank (3) and the reinforcement (8) for a given section; carry out, for at least one hydraulic jack (14), and in succession for all other hydraulic jacks (14), the advance operations that consist of: putting the corresponding moving rod (16) in the retracted position, thus determining the lifting of the corresponding hydraulic jack (14) for the given section; and put the hydraulic jack (14) back in an action without lifting the tank (3); carrying out a second casting of a second segment (28) of the shaft (5) defined by the frame (8) on top of the first segment (28); and repeat the lifting, advancing, and casting operations several times necessary to complete the shaft (5); the method being characterized in that: the advance operations also consist of feeding with sand (30) through the corresponding tubular foot (17) and under the resting means (18) of each hydraulic jack (14) so that when the hydraulic jack (14) is put back into action the jack (14) rests on the sand (30) with the resting means (18); Each hydraulic jack (14) is a double-acting hydraulic jack and comprises two chambers (66, 67), which are designed to be filled with pressurized oil, are equipped with respective pistons (68) connected to the moving rod (16), and they are filled and emptied alternately to move the moving rod (16) in two opposite directions; it comprises the additional step of identifying at least one hydraulic jack (14) that is subjected to a lower load than that of the other hydraulic jacks (14) due to a lack of symmetry of the assembly; and comprises the additional step of hydraulically increasing the load of the hydraulic jack (14) that is subjected to a lower load than that of the other hydraulic jacks (14) in order to balance the loads of all the hydraulic jacks (14), obstructing the oil outlet from the chamber (67) that is emptied of the oil during the upward movement of the moving rod (16).
机译:用于建造由钢筋混凝土制成的水塔(1)的方法,该水塔包括床(2),升高的水箱(3)和将水箱(3)支撑在床(2)上方的竖井(5);该方法包括以下步骤:将床(2)设置在地板上;在床(2)上方和模架(9)的顶部完成用于形成井道(5)的水箱(3),该水箱(3)包括一个可移除的环形加强件(8),其内部截面与容器的内部截面相同形成的杆身(5)的高度小于杆身(5)的高度,连接装置(21、22)在框架(8)和坦克(3)之间延伸以形成装甲(8)和箱(3)相对于彼此固定,并且多个液压千斤顶(14)围绕电枢(8)分布,并且每个液压千斤顶(14)包括顶部活动棒(16),底脚(17),下部管状件和搁置装置。 (18)耦接至管状脚(17);对由框架(8)保持与床身(2)接触并覆盖液压千斤顶(14)的管状底脚(17)的轴(5)的第一部分(28)进行第一浇铸;将液压千斤顶(14)的移动杆(16)从最初的缩回位置向上移动到抽出位置,从而确定给定截面的油箱(3)和加强件(8)的举升;对于至少一个液压千斤顶(14)以及依次执行所有其他液压千斤顶(14)的推进操作,包括:将相应的移动杆(16)置于缩回位置,从而确定提升位置。给定截面的相应液压千斤顶(14);将液压千斤顶(14)放回原处,而无需抬起油箱(3);在第一部分(28)的顶部上第二次铸造由框架(8)限定的轴(5)的第二部分(28);并重复几次提升,推进和铸造操作,以完成竖井(5);该方法的特征在于:前进操作还包括通过相应的管脚(17)并在每个液压千斤顶(14)的搁置装置(18)下方进料砂子(30),以便当液压千斤顶(14) )使千斤顶(14)通过搁置装置(18)搁在沙子(30)上;每个液压千斤顶(14)是双作用液压千斤顶,并包括两个腔(66、67),两个腔(66、67)设计为填充有压力油,并配备有分别与活动杆(16)连接的活塞(68),它们被交替地填充和排空,以使移动杆(16)在两个相反的方向上移动。它包括额外的步骤,即确定至少一个液压千斤顶(14),该液压千斤顶(14)由于组件的不对称性而比其他液压千斤顶(14)承受的负荷低;并包括液压增加液压千斤顶(14)的负载的附加步骤,该负载要比其他液压千斤顶(14)的负载低,以平衡所有液压千斤顶(14)的负载,腔室(67)的出油口在动杆(16)向上运动期间排空了油。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号