首页> 外国专利> OPERATING A WIND POWER PLANT INCLUDING ENERGY STORAGE DURING GRID FAULTS

OPERATING A WIND POWER PLANT INCLUDING ENERGY STORAGE DURING GRID FAULTS

机译:在电网故障期间运行包括能量存储在内的风力发电厂

摘要

Methods, systems, and articles for operating a wind power plant during a grid fault. An energy storage system may be configured to transfer reactive power from the energy storage system to a power grid in response to detecting the grid fault. While providing reactive power to support the grid, the energy storage system may be charged with active power generated by at least one wind turbine generator during the grid fault. Furthermore, the energy storage system supports grid recovery by providing active power after a grid fault is removed.
机译:在电网故障期间用于操作风力发电厂的方法,系统和物品。能量存储系统可以被配置为响应于检测到电网故障而将无功功率从能量存储系统传输到电网。在提供无功功率以支持电网的同时,可以在电网故障期间向能量存储系统充电由至少一个风力涡轮发电机产生的有功功率。此外,储能系统通过消除电网故障后提供有功功率来支持电网恢复。

著录项

  • 公开/公告号WO2012000517A2

    专利类型

  • 公开/公告日2012-01-05

    原文格式PDF

  • 申请/专利权人 VESTAS WIND SYSTEMS A/S;HAJ-MAHARSI MOHAMED;

    申请/专利号WO2011DK50253

  • 发明设计人 HAJ-MAHARSI MOHAMED;

    申请日2011-06-30

  • 分类号F03D7/04;

  • 国家 WO

  • 入库时间 2022-08-21 17:18:31

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号