首页> 外国专利> Implementing a substation automation load transfer function

Implementing a substation automation load transfer function

机译:实现变电站自动化负荷转移功能

摘要

The present invention relates to a process of implementing, or engineering, topology-dependent functions based on a formal description of the Substation Automation system, by performing a topology analysis of the current single line state. A topology interpreting implementation replacing complex topology analysis logics requires only the project specific static single line topology and the connection to the real process state data. All this information can be delivered in an IEC 61850 conforming SCD file, which readily exists for any IEC 61850 based system. The engineering and testing effort of automatic load transfer functions for more complex single line topologies is thus reduced drastically. Also the interface description for controlling and monitoring the load transfer application can be generated automatically from the SCD file.
机译:本发明涉及通过对当前单线状态进行拓扑分析来基于变电站自动化系统的形式描述来实现或设计拓扑相关功能的过程。替代复杂拓扑分析逻辑的拓扑解释实现仅需要项目特定的静态单线拓扑以及与实际过程状态数据的连接。所有这些信息都可以在符合IEC 61850的SCD文件中提供,该文件对于任何基于IEC 61850的系统都很容易存在。因此,可以大大减少针对更复杂的单线拓扑的自动负载转移功能的工程设计和测试工作。同样,可以从SCD文件自动生成用于控制和监视负载转移应用程序的界面描述。

著录项

  • 公开/公告号EP2400617A1

    专利类型

  • 公开/公告日2011-12-28

    原文格式PDF

  • 申请/专利权人 ABB TECHNOLOGY AG;

    申请/专利号EP20100167226

  • 发明设计人 RIETMANN PETER;WIMMER WOLFGANG;

    申请日2010-06-24

  • 分类号H02J3;

  • 国家 EP

  • 入库时间 2022-08-21 17:14:18

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号