CMMI-based project management method according to an embodiment of the present invention, at a first point of time during the execution of the project, the first weight corresponding to the first time point for one or more processes included in the CMMI Calculating the process rate and the reference weight for each process; Calculating a first risk level corresponding to the first time point of the project through the at least one process-specific process rate at the first time point; And updating the first risk with the first weight.;Project, Processor, CMMI, Weights, Risk. monitoring