METHOD OF MANAGING PROJECT BASED ON CAPABILITY MATURITY MODEL INTEGRATION

机译:基于能力成熟度模型集成的项目管理方法

摘要

CMMI-based project management method according to an embodiment of the present invention, at a first point of time during the execution of the project, the first weight corresponding to the first time point for one or more processes included in the CMMI Calculating the process rate and the reference weight for each process; Calculating a first risk level corresponding to the first time point of the project through the at least one process-specific process rate at the first time point; And updating the first risk with the first weight.;Project, Processor, CMMI, Weights, Risk. monitoring
机译:根据本发明实施例的基于CMMI的项目管理方法,在项目执行期间的第一时间点处,第一权重对应于CMMI中包括的一个或多个过程的第一时间点。以及每个过程的参考重量;通过在第一时间点的至少一个特定于过程的过程速率来计算与项目的第一时间点相对应的第一风险等级;并使用第一个权重更新第一个风险。项目,处理器,CMMI,权重,风险。监控

著录项

  • 公开/公告号KR101090759B1

    专利类型

  • 公开/公告日2011-12-08

    原文格式PDF

  • 申请/专利权人

    申请/专利号KR20090044320

  • 发明设计人 이종철;백천희;

    申请日2009-05-21

  • 分类号G06F9/44;G06Q10;

  • 国家 KR

  • 入库时间 2022-08-21 17:11:00

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号