首页> 外国专利> PERPENDICULARITY MEASURING METHOD USING A TOTAL STATION FOR PRECISE CONCRETE CONSTRUCTION

PERPENDICULARITY MEASURING METHOD USING A TOTAL STATION FOR PRECISE CONCRETE CONSTRUCTION

机译:利用全站仪进行精确混凝土施工的垂直测量方法

摘要

PURPOSE: A perpendicularity measuring method using a total station is provided to enable precise concrete construction according to designed position by securing the position of a reference point on each layer of a high-story building.;CONSTITUTION: A perpendicularity measuring method using a total station for precise concrete construction is as follows. Four initial reference points constituting a square are set on the floor of a first layer. Concrete is placed and cured on the floor of the first layer, and the displacements of the four initial reference points are measured and corrected using a total station(T). Concrete is placed and cured on the floor of the upper layer, and the four reference points set on the initial layer are vertically transferred and set on the upper layer using the total station. The matching of the reference points on the initial layer and the reference points on the upper layer is checked using the total station.;COPYRIGHT KIPO 2012
机译:目的:提供一种使用全站仪的垂直度测量方法,以通过确保高层建筑各层上的参考点的位置,根据设计位置进行精确的混凝土施工;组成:使用全站仪的垂直度测量方法具体的混凝土施工方法如下。构成正方形的四个初始参考点设置在第一层的地板上。将混凝土放置并固化在第一层的地板上,并使用全站仪(T)测量和校正四个初始参考点的位移。将混凝土放置并固化在上层地板上,并使用全站仪将垂直设置在初始层上的四个参考点转移并设置在上层上。使用全站仪检查初始层上参考点和上层上参考点的匹配。; COPYRIGHT KIPO 2012

著录项

  • 公开/公告号KR20120005211A

    专利类型

  • 公开/公告日2012-01-16

    原文格式PDF

  • 申请/专利权人 BAK MAN SEO;

    申请/专利号KR20100065835

  • 发明设计人 BAK MAN SEO;

    申请日2010-07-08

  • 分类号E04B1/35;G01C15/00;G01C9/06;

  • 国家 KR

  • 入库时间 2022-08-21 17:10:44

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号