CONSTRUCTION METHOD OF AN UNDERGROUND STRUCTURE THROUGH A TOP-DOWN METHOD USING A PRE-MOUNTED TOWER CRANE CAPABLE OF REDUCING CONSTRUCTION TIME
CONSTRUCTION METHOD OF AN UNDERGROUND STRUCTURE THROUGH A TOP-DOWN METHOD USING A PRE-MOUNTED TOWER CRANE CAPABLE OF REDUCING CONSTRUCTION TIME
展开▼
机译:通过使用预装塔吊减少施工时间的自上而下的地下结构施工方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE: A construction method of an underground structure through a top-down method using a pre-mounted tower crane is provided to simultaneously perform two or more excavation processes.;CONSTITUTION: A construction method of an underground structure through a top-down method using a pre-mounted tower crane is as follows. An earth retaining work and a PRD work are performed. Concrete is placed, and a tower crane(10) is installed on the placed concrete. Slopes around the tower crane are excavated. The outer edge parts of the slopes are processed. A ground layer and multiple underground layers are simultaneously excavated.;COPYRIGHT KIPO 2012