首页> 外国专利> CONSTRUCTION METHOD OF AN UNDERGROUND STRUCTURE THROUGH A TOP-DOWN METHOD USING A PRE-MOUNTED TOWER CRANE CAPABLE OF REDUCING CONSTRUCTION TIME

CONSTRUCTION METHOD OF AN UNDERGROUND STRUCTURE THROUGH A TOP-DOWN METHOD USING A PRE-MOUNTED TOWER CRANE CAPABLE OF REDUCING CONSTRUCTION TIME

机译:通过使用预装塔吊减少施工时间的自上而下的地下结构施工方法

摘要

PURPOSE: A construction method of an underground structure through a top-down method using a pre-mounted tower crane is provided to simultaneously perform two or more excavation processes.;CONSTITUTION: A construction method of an underground structure through a top-down method using a pre-mounted tower crane is as follows. An earth retaining work and a PRD work are performed. Concrete is placed, and a tower crane(10) is installed on the placed concrete. Slopes around the tower crane are excavated. The outer edge parts of the slopes are processed. A ground layer and multiple underground layers are simultaneously excavated.;COPYRIGHT KIPO 2012
机译:目的:提供一种通过使用预装塔吊的自上而下的方法进行地下结构施工的方法,以同时执行两个或多个挖掘过程。;构成:采用自上而下的方法通过使用自上而下的方法进行地下结构施工方法预安装的塔式起重机如下。进行土方工程和珠三角工程。放置混凝土,并在放置的混凝土上安装塔式起重机(10)。挖掘塔式起重机周围的斜坡。加工斜坡的外边缘部分。同时挖掘一个地层和多个地下层。; COPYRIGHT KIPO 2012

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号