Continuous Construction Method for Composite Bridge using Prestressed I-Type Girder
Continuous Construction Method for Composite Bridge using Prestressed I-Type Girder
展开▼
机译:预应力工字梁组合桥的连续施工方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE: A continuous construction method for composite bridge using prestressed I-type girder is provided to reduce the construction cost and maintenance expense by inducing the pressing force to the whole structure. CONSTITUTION: A continuous construction method for composite bridge using prestressed I-type girder comprises followings. A first tendon of the girder has a post-tensioning(S1). A side span girder is installed between an abutment and the bridge post. A middle span girder is installed between the bridge posts(S2). The side span girder and the middle span girder are structurally and mutually connected(S3). A permanent supporting board is installed. A second tendon is mounted at each span by prestressing(S5).