PURPOSE: A water cycle soundness simulating method of a ubiquitous city is provided to previously determine water cycle soundness by comparing current water cycle ratio with water cycle ratio before city construction. CONSTITUTION: The used amount of initial water process facility(NO1), the used amount of water process facility(NO2), the underground infiltration of rainwater(NO3), and the infiltration of underground water(NO4) are respectively calculated. The calculated data is fitted. A nature system water cycle soundness rate is calculated. The calculated data is changed in case the calculated nature system water cycle soundness rate is less than a target value. A value is corrected.
展开▼