首页> 外国专利> Power units with the union of the locking-control valves on the lines of the steam supply to the steam turbine and with stop valves on lines RESET steam in condensers

Power units with the union of the locking-control valves on the lines of the steam supply to the steam turbine and with stop valves on lines RESET steam in condensers

机译:动力单元,在向蒸汽轮机供应蒸汽的管路上带有锁止控制阀,在管路上带有截止阀,用于复位冷凝器中的蒸汽

摘要

The invention relates to the field of power engineering and can be used in new construction, renovation and modernization of power units with steam turbine and combined cycle power plant (CCPP and PTU). The energy unit comprises a steam turbine with cylinders of high, medium and low pressure CVP 3, IPC 4, LPC 5 and capacitor 6 and the lines 20, 23, 11 for supplying to said respective pressure steam turbine (HP, MP, LP) from the shut-off control valves installed at least 20 supplying line pair WD, line 22 discharging vapor at promperegrev and at least one high-speed-reducing cooling unit (BROU) connected at least to the line 20 and connected at the output to said capacitor 6 or with the line 23 hot s reheat thread with discharge lines 26, 27, 28. The difference: conductivity of steam shut-off and regulating valve is formed as one for each line 20, 23, 11, a combined trip-IBS-regulating valve 21, 24, 25 and each bleed line 26-28 or on unifying their common bleed line 26 or 27 to a capacitor 6 is further installed shutoff valve 34 1 .. n. f ly-8-yl.
机译:本发明涉及动力工程领域,可用于带有汽轮机和联合循环发电厂(CCPP和PTU)的动力装置的新建,改造和现代化。能量单元包括具有高压,中压和低压气缸CVP 3,IPC 4,LPC 5和电容器6的蒸汽轮机,以及用于向所述相应压力蒸汽轮机(HP,MP,LP)供气的管线20、23、11。从安装有至少20个供应管线对WD的截止控制阀,22以properperegrev排出蒸汽的管线和至少一个至少与管线20连接并在输出端连接至所述管线的高速减速冷却单元(BROU)电容器6或带有排放管线26、27、28的管线23的加热线。区别在于:蒸汽切断和调节阀的电导率形成为每条管线20、23、11的总成,即跳闸IBS截止阀34 1 ..n进一步安装有调节阀21、24、25和每个排出管线26-28,或者在将它们的共用排出管线26或27统一到电容器6时。 f ly-8-基。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号