首页> 外国专利> RECOVERY METHOD OF MINED-OUT PITS FOR CONSTRUCTION OF CEMETERY-MUSEUM

RECOVERY METHOD OF MINED-OUT PITS FOR CONSTRUCTION OF CEMETERY-MUSEUM

机译:公墓,博物馆建设采空区恢复方法

摘要

FIELD: mining.;SUBSTANCE: method involves filling of the worked-out area to the boundary of upper level of ground water with construction waste close as to its composition to natural minerals with fractions of various size, layer by layer with further compaction of each layer, laying of drainage layer with construction waste with thickness of not less than 0.6 metre and with fraction size of 150-200 mm. At that, topographic mapping of the whole pit is performed, and as per its results there made is planning with extraction of sections representing geological natural monument and sections subject to further filling. At that, filling with construction waste is performed while cuts of deposits representing geological natural monument are kept free, and possibility of access to them, monitoring them and arranging the museum of the Earth is provided. The rest sections of the pit according to the planning are broken into zones and filled; at that, overburden rocks are laid on the drainage layer. Hill is formed in one of the zones with its further terracing. Burial places are built on terraces. Columbarium and crematorium rooms are built in the rest zones. Foundation bases of the above buildings are arranged in the following sequence: first, overburden rocks laid on drainage layer are levelled, and piles are driven to the design depth from planning level of the pit. Then, buffer pad from sand of average grain size is made without compaction and binding concrete is provided above buffer pad. Zones are separated from each other by means of artificially created three-dimensional soil shapes, and tracks and access ways are covered with natural or artificial stone.;EFFECT: reducing labour costs of recovery work.;2 dwg
机译:领域:采矿;方法:该方法涉及用建筑废料填充接近工作区域的地下水上层边界,其组成接近于天然矿物,其天然矿物的大小各不相同,并逐层进一步压实层,铺设排水层,排水层的厚度不得小于0.6米,级分大小为150-200 mm。那时,将对整个矿坑进行地形图绘制,并根据其结果制定计划,提取代表地质自然遗迹的剖面和需要进一步填充的剖面。那时,在不浪费代表地质自然遗迹的沉积物的同时,进行建筑废料的填充,并提供了进入这些废物,对其进行监视并安排地球博物馆的可能性。根据计划,坑的其余部分被分成几部分并填满;那时,在排水层上覆盖了覆盖岩。丘陵形成于其中之一,并具有进一步的梯级。墓地建在露台上。休息区设有骨灰lum室和火葬场。上述建筑物的基础按以下顺序排列:首先,将排水层上的覆岩铺平,并从基坑的规划高度将桩打入设计深度。然后,由平均粒度的沙子制成的缓冲垫没有压实,并且在缓冲垫上方提供了粘结混凝土。区域通过人工创建的三维土壤形状彼此分隔,轨道和通道被天然或人造石材覆盖。效果:降低了恢复工作的人工成本; 2 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号