首页> 外国专利> METHOD TO INCREASE STABILITY OF CEILING IN DOWNWARD SLICING DEVELOPMENT OF DEPOSIT WITH BACKFILLING

METHOD TO INCREASE STABILITY OF CEILING IN DOWNWARD SLICING DEVELOPMENT OF DEPOSIT WITH BACKFILLING

机译:增加回填矿床下限开采过程中上限稳定性的方法

摘要

FIELD: mining.;SUBSTANCE: method to increase stability of a ceiling in downward slicing development of a deposit with backfilling includes serial tunnelling and backfilling of parallel mines - stope entries, leaving ore pillars with width equal to one, two or three spans of mines, backfilling of mines with a concrete mix, and after backfilling hardens, ore pillars left between concrete strips are mined. At the same time the vault of stope entries is arranged as deep, besides, ore pillars are left in the roof between concrete backfilling of adjacent stope entries.;EFFECT: higher stability of a mine ceiling.;4 dwg
机译:领域:采矿;实体:通过回填增加矿床向下分层发展过程中的顶棚稳定性的方法,包括对平行矿山进行连续掘进和回填-采场入口,留下宽度等于一,二或三跨度的矿柱,用混凝土混合物回填矿山,回填硬化后,开采残留在混凝土条之间的矿柱。同时,采场入口的拱顶布置得很深,此外,在相邻采场入口的混凝土回填之间的顶部还留有矿柱。效果:矿山顶板的稳定性更高; 4 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号