首页> 外国专利> Application manner of the steel copper frame in the building

Application manner of the steel copper frame in the building

机译:钢铜框架在建筑物中的应用方式

摘要

P To provide a construction method for steel furring strips in a building, for reducing the number of corrosion-proof painting processes and welding processes, joining the steel furring strips each constituted of a closed cross sectional material mutually in high precision in a simple structure and reducing burdens of workers engaged in bolt joining work at site required for mounting the steel furring strips for the building. PSOLUTION: The first and second steel furring strips 1 and 2 are constituted of molded products of pre-plated steel plates having a closed cross section and made of highly anti-corrosive fused Zn-Al-Mg alloy and mounting hardware 3 is constituted of a molded product of a pre-plated steel plate made of highly anti-corrosive fused Zn-Al-Mg alloy. The mounting hardware 3 attached to the first steel furring strip 1 with a one side bolt 5 assembles a steel furring strips assembly 4 to the building after manufacturing the steel furring strips assembly 4 attached to the second steel furring strip 2 with a one side bolt 5 and connected with the first and second steel furring strips 1 and 2. PCOPYRIGHT: (C)2011 and JPO& INPIT
机译:

提供一种用于建筑物中的钢制支撑条的施工方法,以减少耐腐蚀的涂漆工艺和焊接工艺的数量,以简单的方式将由封闭截面材料构成的钢制支撑条彼此高精度地接合。结构和减轻在现场安装螺栓连接工作所需的工人负担,以安装建筑物的钢制支撑条。

解决方案:第一和第二钢衬条1和2由具有封闭横截面的预镀钢板模制产品构成,并由高度防腐的熔融Zn-Al-Mg合金制成,其安装硬件3由高度防腐的熔融Zn-Al-Mg合金制成的预镀钢板的模制产品组成。在用一个侧面螺栓5制造附接到第二钢支撑条2上的钢支撑条组件4之后,通过一个侧面螺栓5将附设于第一钢支撑条1上的安装硬件3将钢支撑条组件4组装到建筑物上。并与第一和第二钢撑条1和2连接。

版权所有:(C)2011和JPO&INPIT

著录项

  • 公开/公告号JP5319399B2

    专利类型

  • 公开/公告日2013-10-16

    原文格式PDF

  • 申请/专利权人 大和ハウス工業株式会社;

    申请/专利号JP20090128331

  • 发明设计人 高松 浩一;宮田 昌信;

    申请日2009-05-27

  • 分类号E04B2/56;

  • 国家 JP

  • 入库时间 2022-08-21 16:58:31

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号