Digestion method of excess sludge by lack of normal time
Digestion method of excess sludge by lack of normal time
展开▼
机译:缺乏正常时间消化多余污泥的方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
This invention is developed by including the intermittent sequential ozonation process to the commonly employed aerobic biological sludge digestion process, which is used for reducing the amounts of by-product waste sludge produced in treatment plants; thereby stabilizing the sludge in a shorter period and at a lower cost, as compared to the state of the art of the technique. With the intermittent sequential ozonation process used for sludge digestion, ozone is applied to the waste sludge intermittently and not continuously. Following the ozone application, sludge is aerated in the aerobic digester by one doubling time and at the end of this period it is re-ozonated. The COD, released following disintegration of the floc structures by ozone application, is re-consumed by bacteria both completing sludge digestion and carbon removal. Over 80% reductions in sludge amount have been achieved by dosing different amounts of ozone with respect to the changing sludge concentrations. Although normal aerobic digestion takes 15-30 days to complete, in intermittent ozone dosing process digestion is completed in very short periods such as 4 days. Due to stabilized and sterilized condition of the sludge and its high concentration of phosphorus, digested sludge may be used as soil fertilizer.
展开▼