首页>
外国专利>
BUILDING FAULTED GRIDS FOR A SEDIMENTARY BASIN INCLUDING STRUCTURAL AND STRATIGRAPHIC INTERFACES
BUILDING FAULTED GRIDS FOR A SEDIMENTARY BASIN INCLUDING STRUCTURAL AND STRATIGRAPHIC INTERFACES
展开▼
机译:为沉积盆地建立故障网格,包括结构和地层界面
展开▼
页面导航
摘要
著录项
相似文献
摘要
A method can include providing, in a computational space coordinate system, an initial, at least vertically structured, multidimensional grid that includes initial nodes that define grid cells; referencing a conformal mesh to identify a set of grid cells of the grid traversed by a fau rasterizing the fault within the grid along the identified set of grid cells to split the grid along the rasterized fault into first side grid cells and second side grid cells; altering the grid by projecting nodes from the first side grid cells to a first side of the fault and projecting nodes from the second side grid cells to the second side of the fau and transforming the altered grid to generate, in the real space coordinate system, a transformed grid. Various other apparatuses, systems, methods, etc., are also disclosed.
展开▼