A method for construction of anti-slide draining element of concrete lining of irrigation channel that includes gathering of draining pipe of perforated plastic pipe through installation at the front end of the plastic pipe of a plug, with winding plastic pipe around with filter made of roll geo-textile material, drilling in concrete lining of channel and earth massif of horizontal well with drilling working element, extraction of the drilling working element from horizontal well, introduction of draining pipe to horizontal well and extraction of connecting block made of monolithic concrete in the mouth of the drain for hermetic connection of the mouth end of the draining pipe with concrete lining of the channel. Drilling of horizontal well is carried out in two steps, at the first step horizontal opening in concrete lining of the channel is formed by means of perforator with drilling working element with diameter 10-50 mm through drilling in percussion-rotary mode a set of technological openings by pre-marked perimeter of horizontal opening in concrete lining with following removal of concrete core from horizontal opening, and at the second step horizontal well is drilled in earth massif in rotary mode by means of perforator with screw drilling working element with diameter that is 1.02-125 times smaller compared to diameter of horizontal opening in concrete lining of the channel and 1.2-2.0 times larger compared to the diameter of the draining pipe, at that operation of extraction of the screw drilling working element from horizontal well is performed in mode of working rotation of the drilling working element, and operation of introduction of draining pipe to horizontal well is started after the end of operation of extraction of the screw drilling working element from horizontal well with minimal time interval that does not exceed 10 s.
机译:一种灌溉渠混凝土衬砌防滑排水元件的施工方法,该方法包括通过安装在塞子的塑料管的前端来收集多孔塑料管的排水管,并用卷筒状过滤器缠绕塑料管。土工织物材料,在水平井的通道和土层的混凝土衬砌中进行钻孔,并使用钻孔工作元件,将钻井工作元件从水平井中抽出,将排水管引入水平井,并在其中抽出整体混凝土制成的连接块排水口,用于将排水管的嘴端与通道的混凝土衬层进行气密连接。水平井的钻探分两步进行,第一步是通过冲孔机,以直径为10-50 mm的钻孔工作元件,通过冲击-旋转方式钻孔,在通道混凝土衬砌中形成水平开口。通过预先标记混凝土衬砌中水平孔的周长来开孔,然后从水平孔中移除混凝土芯,然后在第二步中,通过带有螺旋钻加工元件的射孔器以旋转方式在地块中以旋转方式在地块中钻出直径为相对于通道混凝土衬砌中水平开口的直径小1.02-125倍,比排水管的直径大1.2-2.0倍,在这种情况下,螺旋钻探工作元件从水平井中抽出的操作钻探工作元件的工作旋转以及将排水管引入水平井的操作开始之后从水平井中抽出螺旋钻探工作元件的操作结束,最小时间间隔不超过10 s。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号