首页> 外国专利> THE CONSTRUCTING METHOD AND EQUIPMENT OF THE LONG SPAN STEEL STRUCTURE AND THE STRUCTURE THEREBY

THE CONSTRUCTING METHOD AND EQUIPMENT OF THE LONG SPAN STEEL STRUCTURE AND THE STRUCTURE THEREBY

机译:大跨度钢结构的构造方法,设备及结构

摘要

PURPOSE: A long span steel structure, a construction device, and a method thereof are provided to construct a long span structure without using a large crane. CONSTITUTION: The construction method of a long span steel structure(80) comprises the following steps. A plurality of parallel rails(20) are installed on the top end of an existing structure from a lifting position to an installing position(81). An assembling area is built around the existing structure for assembling the long span steel structure. The long span steel structure is lifted to the lifting position and settled in a holder. The long span steel structure is positioned in the lifting position by repeating the above steps, is connected by a purlin, and is integrally pushed to the installing position by an extrusion device(23). The long span steel structure in the installing position is joined to the existing structure for completing the installation.
机译:目的:提供一种大跨度钢结构,施工装置及其方法,以在不使用大型起重机的情况下构造大跨度结构。组成:大跨度钢结构(80)的施工方法包括以下步骤。从提升位置到安装位置(81),多个平行导轨(20)安装在现有结构的顶端。围绕现有结构建造了一个装配区域,用于装配大跨度钢结构。大跨度钢结构被提升到提升位置并固定在支架中。通过重复上述步骤将大跨度钢结构定位在提升位置,并通过a条连接,并通过挤压装置(23)将其整体推到安装位置。将处于安装位置的大跨度钢结构与现有结构连接起来以完成安装。

著录项

  • 公开/公告号KR101269531B1

    专利类型

  • 公开/公告日2013-06-04

    原文格式PDF

  • 申请/专利权人 NOWON INDUSTRIAL CO. LTD.;

    申请/专利号KR20120149701

  • 发明设计人 CHO HEI JIN;

    申请日2012-12-20

  • 分类号E01D21;

  • 国家 KR

  • 入库时间 2022-08-21 16:25:04

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号