首页>
外国专利>
The Method Of Laying Plan Considering Working Completion Time And Job Completion Time Of Crane Work For Loading or Unloading of Cargo Using Train At The Container Terminal
The Method Of Laying Plan Considering Working Completion Time And Job Completion Time Of Crane Work For Loading or Unloading of Cargo Using Train At The Container Terminal
PURPOSE: A schedule plan establishment method for considering a range of task completion time of a resident company and task completion time of a crane for loading and unloading of railroad goods in a container terminal is provided to effectively establish a task plan for a container task and equipment management. CONSTITUTION: The most minimal solution of adding ranges of task completion time of a crane and task completion time of a resident company is determined as an initial solution(S100). The best solution is determined among a plurality of neighbor solutions which is generated through an exchange method(S200). A schedule plan of a loading or unloading task of the crane is established by the best solution(S300). [Reference numerals] (AA) Start; (BB) End; (S100) Initial solution generating step; (S110) Resident company grouping step; (S120) Candidate solution generating step; (S130) Initial solution determining step; (S200) Solution improving step; (S210) Target function value calculating step; (S220) Initial solution changing step; (S230) Best solution determining step; (S300) Schedule planning step
展开▼