首页> 外国专利> METHOD FOR STABILIZATION OF SOFT GROUND OR DAM DAM AND BLADE BLADE OR

METHOD FOR STABILIZATION OF SOFT GROUND OR DAM DAM AND BLADE BLADE OR

机译:稳定软土地基或坝坝和叶片的方法

摘要

FIELD: construction.;SUBSTANCE: invention relates to the construction, namely to the stabilisation of dam or blade on the soft, infirm ground. Method for stabilising the dam or blade on the soft, infirm ground, in which walls rigid for bending, consisting of steel profiles driven deep into the ground, sheet piles or pillars, are erected on borders of foreseen embankment for dam and blade formation, at least on two sides located opposite each other of the planned embankment. High-strength elements operating for extension, in particular, ropes, bundles of filaments, chains, belts and connected with walls possibly rigidly are placed on the soft ground parallel to each other at height of the soft ground surface. Material web lying on the surface of the soft soil or film strip separating the soft soil from embankment or joined instead of high-strength elements, working in tension and separating the material webs possible rigidly at height of the soft soil surface with walls, are placed between the walls and elements working in tension.;EFFECT: assurance of reliable prevention of large deformations and sedimentation during and after pouring of dumps or dam on the soft and infirm ground.;16 cl, 8 dwg
机译:技术领域本发明涉及一种构造,即涉及在软弱的地面上稳定水坝或叶片的构造。在软弱的地面上稳定水坝或叶片的方法,其中在可预见的堤坝的边界上竖立用于弯曲的刚性墙体,该墙体由深入地下的钢型材,板桩或支柱组成,用于建造水坝和叶片至少在计划的路堤彼此相对的两侧。为了伸展而工作的高强度元件,特别是绳索,细丝束,链,皮带以及可能牢固地与壁连接的元件,在软土地面上高度彼此平行地放置在软土地上。放置在软土或薄膜条表面上的材料网,将软土与路堤分开,或者代替高强度元素而连接在一起,在高张力下工作,并在具有壁的软土表面高度上将材料网刚性隔离。效果:确保可靠地防止在软弱的地面上倾倒垃圾或大坝期间和之后的大变形和沉降。; 16 cl,8 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号