首页> 外国专利> Precast concrete frame of the building, PLANTS hard solid joints 'ISS-XXI CENTURY', executed on technology continuous molding

Precast concrete frame of the building, PLANTS hard solid joints 'ISS-XXI CENTURY', executed on technology continuous molding

机译:建筑物的预制混凝土框架,采用技术连续成型法制成的PLANTS硬实心接头“ ISS-XXI CENTURY”

摘要

an reinforced concrete building frame with rigid u043cu043eu043du043eu043bu0438u0442u043du044bu043cu0438 u0441u0442u044bu043au0430u043cu0438 "expedition of 21st century (iss is a stave system), represents the construction construction technology with simplified mounting without the use or to minimize the number of supporting the installation of equipment, consisting of columns and u043fu0435u0440u0435u043au0440u044b tai, where overlap is lower plane without acting elementsor u0431u0430u043bu043eu0447u043du044bu043c u0440u0438u0433u0435u043bu0435u043c, hiding in the side wall or walls, and the design of supporting structure including columns, stairwell, headers and p we can produce them lit dry method of continuous molding.in the case of the columns are installed after the full mounting elements overlap and u0437u0430u043cu043eu043du043eu043bu0438u0447u0438u0432u0430u043du0438u044f nodes on the issues of the valve openings in which the pre u0438u043du044au0435u0446u0438u0440u043eu0432u0430u043d u043fu043eu043bu0438u043cu0435u0440u0440u0430u0441u0442u0432u043eu0440. staircase going from the u043au043eu0441u043eu0443u0440u043eu0432, beams, slabs and the liner. u0440u0438u0433u0435u043bu0438 sets in the design position, based on the columns or pillars.the plate part is cut, in which it rests when installing the bearing mandrel, hidden in the.slab floors, after filling a monolithic part of hidden in the u0440u0438u0433u0435u043bu044f rely on it through concrete u0448u043fu043eu043du043au0438 and the slice, and u0440u0438u0433u0435u043bu0438, on the external walls or partitions, floor slabs are derived directly and through the concrete u0448u043fu043eu043du043au0438, limited traffic with holes.solid part of the u0440u0438u0433u0435u043bu044f, hidden in the catwalk and u0441u0432u044fu0437u0435u0432u043eu0433u043e u0440u0438u0433u0435u043bu044f, 50 seventy mm above the upper plane part (the height of a sand caps), i.e. is u0442u0430u0432u0440u043eu0432u043eu0435 ratio, reinforcement which is differentiated depending on the bending moment in a u0440u0438u0433u0435u043bu044f, which increases the passage of riga lei. 1 for instance. s - lu, 9).
机译:具有刚性 u043c u043e u043d u043e u043b u0438 u0442 u043d u044b u043c u0438 u0441 u0442 u044b u043a u0430 u043c u043c u0438 “ 21世纪探险( iss是冷却壁系统),代表了简化的安装施工结构,无需使用或尽量减少支持设备安装的数量,包括立柱和 u043f u0435 u0440 u0435 u043a u0440 u044b其中重叠是没有作用元素的下平面或 u0431 u0430 u043b u043e u0447 u043d u044b u043c u0440 u0438 u0433 u0435 u043b u0435 u043c,并且隐藏在侧壁或墙壁中,并且设计包括柱子,楼梯间,集管和p在内的支撑结构,我们可以用干法连续成型的方法生产它们。在安装完所有安装元件后,将柱子安装好之后, u0437 u0430 u043c u043e u043e u043d u043e u043b u0438 u0447 u0438 u0432 u0430 u043d u0438 u044f节点上的阀门开度问题前置 u0438 u043d u044a u0435 u0446 u0438 u0440 u043e u043e u0432 u0430 u043d u043f u043e u043b u043b u0438 u043c u0435 u0440 u0440 u0440 u0430 u0441 u0442 u0432 u0432 u0440。从 u043a u043e u0441 u043e u0443 u0440 u043e u0432开始的楼梯,横梁,楼板和衬砌。 u0440 u0438 u0433 u0435 u043b u0438根据圆柱或立柱设置在设计位置,将板材切割,在安装轴承心轴时将其搁置在地板上,填充后隐藏在楼板地板中 u0440 u0438 u0433 u0435 u043b u044f中隐藏的一个整体部分通过具体的 u0448 u043f u043e u043d u043a u0438和切片以及 u0440 u0438 u0433 u0435 u043b u0438,在外墙或隔断上,直接通过混凝土 u0448 u043f u043e u043d u043d u043a u0438导出地板,带有孔的流量有限。 u0440 u0438 u0433 u0435 u043b u044f,隐藏在走秀台和 u0441 u0432 u044f u0437 u0435 u0432 u043e u0433 u043e u0440 u0438 u0433 u0435 u043b u044f,位于上平面上方70毫米(砂帽的高度),即 u0442 u0430 u0432 u0440 u043e u0432 u043e u0435的比例,根据弯曲力矩在 u0440 u0438 u0433 u0435 u043b u044f,我增加了里加雷伊的通过。例如1。 s-lu,9)。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号