首页> 外国专利> METHOD TO ISOLATE EMERGENCY SECTION OF UNDERGROUND MINE

METHOD TO ISOLATE EMERGENCY SECTION OF UNDERGROUND MINE

机译:隔离地下矿井应急部分的方法

摘要

FIELD: mining.;SUBSTANCE: method includes drilling of wells between earth surface and roof of an underground mine, erection of an insulating barrier link by supply of a hardening material into an underground mine whenever an emergency occurs related to self-ignition of coal. The section of the underground mine in the place of erection of the isolating barrier link is worked with increased height, which is gradually increased from borders of this section to its middle. The well is drilled between earth surface and a point with maximum height of the underground mine, and supply of the hardening material into a mine is carried out to complete filling of the section with increased height with hardening material. On the borders of the section with increased height of the mine prior to start of hardening material supply into an underground mine, barriers are installed, width of which is accepted as equal to or less than the width of the mine in the place of barriers installation, and the height of the barriers is determined using a special expression.;EFFECT: increased reliability of isolation of an emergency section in case of underground fires and reduced material and labour inputs.;2 dwg
机译:技术领域:方法:该方法包括在地下矿井的地表和屋顶之间的井中钻探,通过在地下矿井中发生与煤自燃有关的紧急情况而向地下矿井中供应硬化材料来建立绝缘屏障连接。地下矿山在隔离屏障连接的竖立位置上的工作高度增加,该高度从该部分的边界到中间逐渐增加。在地表和地下矿井的最大高度的点之间钻探该井,然后向矿井中供应硬化材料,以完成用硬化材料填充高度增加的部分。在开始向地下矿井中供应硬化材料之前,在矿井高度增加的部分的边界上,安装了障碍物,该障碍物的宽度等于或小于代替障碍物安装位置的矿井宽度;效果:使用特殊表达式确定屏障的高度。效果:在发生地下火灾时减少紧急情况隔离的可靠性,并减少了材料和人工投入。2 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号