FIELD: oil and gas industry.SUBSTANCE: method includes assembling at the mouth and descending into the well of long string with packer and short string. Preliminary the operated string is gauged by the gauge with length not less than packer's length, there defined is an interval of link for packer not less than 3.5 m long with concrete in behind-the-casing space, the packer is descended at the casing string, there performed is an exploration with determination of intake of disintegrated formations, the packer is lifted. At long string assembling prior to packer installation there assembled is a branch pipe with locking ring and highly pressurised couplings or couplings with sealant on thread that have external diameter reduced by 2 mm compared to the standard, above the packer there mounted is a pipe branch with couplings, one pipe of casing string with reference pipe branch, then the casing string is assembled on highly pressurised couplings or couplings with sealant on thread, the packer is mounted, there performed is a tensioning of long string by load exceeding the string dead weight by 2-3 t, the long string is fixed in eccentric at well mouth, eccentric is fixed in wellhead equipment. At short string installation the tubing is assembled on couplings with sealant on thread, the string bottom is equipped with coupling, short string includes additional pipe branches, by which the couplings of one string are located between the couplings of the other string, after descending of each 4-6 tubes the short string is lifted and descended at the length of 1 tube not less than 2 times, the shoe of the short string is located above the roof of upper formation by 20-30 m. The well is filled with anti-corrosion fluid above the level of short string bottom. For string installation there used are the tubes with internal anti-corrosion and antifouling smooth coating. There performed is the string gauging by gauge with polyamide coating.EFFECT: increase of method efficiency due to exclusion of string twisting relatively each other, thread loosening and tubes turn-away, exclusion of pressure-tightness failure.3 ex
机译:领域:石油和天然气工业。实质:该方法包括在口处组装并用封隔器和短管下降到长管井中。预先用长度计不少于封隔器长度的量规对作业管柱进行计量,在套管后的空间中,混凝土之间应有一个不少于3.5 m长的封隔器链节,封隔器下降到套管柱处,进行了一次勘探,确定了分解的地层的摄入量,然后抬起了封隔器。在安装封隔器之前进行长线组装时,组装的是带有锁紧环的分支管和螺纹上带有密封剂的高压联轴器或联轴器,与标准相比外径减小了2 mm,在封隔器上方安装了一个带有接头,将一根套管管柱与参考管分支连接起来,然后将套管管柱组装在高压接头上或在螺纹上加密封剂的接头上,安装封隔器,并通过超过管柱自重的载荷对长管柱进行张紧。 2-3吨,长柱固定在井口偏心,偏心固定在井口设备中。在短管柱安装时,将管件组装在螺纹上带有密封剂的管接头上,管柱底部装有管接头,短管柱包括附加的支管,通过该支管,一根管柱的接头在另一根管柱下降之后位于另一根管柱的接头之间。短管柱每4-6根管子以1根管的长度提升和下降不少于2次,短管柱的鞋面位于上部地层顶板上方20-30 m。井在短管柱底部以上的位置填充了防腐液。对于管柱安装,使用了具有内部防腐和防污光滑涂层的管。效果:使用聚酰胺涂层的量规进行线规测量。效果:由于排除了彼此相对扭曲的线,螺纹松动和管子弯曲,排除了压力密封性故障,提高了方法效率。3 ex

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号