首页>
外国专利>
Exploration of how the natural ground and geological structure of the front of the tunnel face
Exploration of how the natural ground and geological structure of the front of the tunnel face
展开▼
机译:隧道正面自然地面和地质结构的探索
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a method of surveying natural ground and geological structure ahead of a tunnel face, by using a borehole camera capable of being applied to soft natural ground on which pit walls do not support themselves.;SOLUTION: By forming a borehole ahead of a tunnel face by using transparent pipe members P as relay pipes 14 of a boring machine B, the transparent pipe members P are installed in the borehole. The transparent pipe members P installed in the borehole have a borehole camera 3 inserted into themselves, and the borehole camera photographs the condition of natural ground via the transparent pipe members P.;COPYRIGHT: (C)2012,JPO&INPIT
展开▼