首页>
外国专利>
Before providing the through hole in the beam of the existing building, it extends to the methodological null
Before providing the through hole in the beam of the existing building, it extends to the methodological null
展开▼
机译:在为现有建筑物的梁提供通孔之前,它会扩展至方法学上的空白。
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To facilitate handling of a member, which is attached to a lateral portion of a beam of an existing building when the beam is reinforced before a through-hole is provided in the beam, by reducing the weight of the member.;SOLUTION: This method for reinforcing the beam includes: a step of providing a first interval toward each end portion of a lateral portion of the beam to an drilling area thereof, of providing a first non-through-hole in a first position in which a second interval longer than the first interval is provided upward, and of providing a second non-through-hole in a second position in which the second interval is provided downward; a step of providing the first interval in each of upward and downward directions from the drilling area, of providing a third non-through-hole in a third position in which the second interval is provided toward a portion at one end, and of providing a fourth non-through-hole in a fourth position in which the second interval is provided toward a portion at the other end; a step of inserting one end of a first reinforcement into the first non-through-hole, of inserting the other end thereof into the second non-through-hole, and of fixing each end to the inside of the beam; and a step of inserting one end of a second reinforcement into the third non-through-hole, of inserting the other end thereof into the fourth non-through-hole, and of fixing each end to the inside of the beam.;COPYRIGHT: (C)2012,JPO&INPIT
展开▼