首页> 外国专利> Construction and installation process to deploy a wind turbine 'WTG' on a tension leg platform/spar in medium to deep water

Construction and installation process to deploy a wind turbine 'WTG' on a tension leg platform/spar in medium to deep water

机译:在中至深水中将风力涡轮机“ WTG”部署在张紧腿平台/翼梁上的施工和安装过程

摘要

Method for installation of a wind turbine generator on a tension leg platform/spar (WTG foundation) using gravity anchors or suction anchors. A concrete WTG foundation is built with the ‘slip form’ method, a combination construction/deployment barge (barge) allows the WTG and WTG foundation to be delivered to the installation site as a complete unit and a split hull hydraulic dump scow facilitates the slip form construction and deployment of the gravity anchors. The barge is sunk as a dry dock to a draft that permits the WTG/WTG foundation to be floated off. The free floating WTG foundation is ballasted with sea water to its operating draft with 5 feet of freeboard. The tension legs from the gravity anchors are attached to the WTG foundation and snugged with equal tension. The sea water is then removed from the WTG foundation. This process tightens the tension legs to their design loads. The WTG/WTG foundation maintains a relatively large water plane and a 5 foot freeboard. The gravity anchors are constructed and deployed to the installation site, with tension legs attached, by means of a split hull hydraulic dump scow. Four gravity anchors are deployed for each WTG installation.
机译:使用重力锚或吸力锚将风力涡轮发电机安装在张紧腿平台/翼梁(WTG基础)上的方法。使用“滑模”方法建造混凝土WTG基础,组合的构造/部署驳船(驳船)允许将WTG和WTG基础作为一个完整的单元交付到安装现场,而分体式液压倾卸式铲斗则有助于滑动形式建造和部署重力锚。驳船作为干船坞沉没在吃水深度上,以允许WTG / WTG基础浮起。自由浮动的WTG基础用5英尺高的干舷用海水压载至其工作吃水。来自重力锚的拉力支腿连接到WTG基础,并以相等的拉力紧贴。然后从WTG基础中除去海水。此过程将张紧脚收紧到其设计载荷。 WTG / WTG基础保持相对较大的水上飞机和5英尺高的干舷。利用分体式液压倾卸铲斗将重力锚建造并部署到安装现场,并附上张力腿。每个WTG安装都部署了四个重力锚。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号