首页>
外国专利>
System and method to enable power related decisions to start additional workload based on hardware power budget in a virtulization environment
System and method to enable power related decisions to start additional workload based on hardware power budget in a virtulization environment
展开▼
机译:用于在虚拟化环境中基于硬件功耗预算使电源相关决策启动更多工作负载的系统和方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
An information handling system includes a first power detector that detects a first power level of the information handling system, a second power detector that detects a second power level of the information handling system, and a virtual machine manager. The virtual machine manager is operable to receive the first power level and the second power level, apportion a first portion of the first power level to a first workload instantiated on the information handling system, apportion a second portion of the first power level to a second workload instantiated on the information handling system, apportion a first portion of the second power level to the first workload, and apportion a second portion of the second power level to the second workload.
展开▼