首页> 外国专利> System and method for mitigating an electric unbalance of a three-phase current at a point of common coupling between a wind farm and a power grid

System and method for mitigating an electric unbalance of a three-phase current at a point of common coupling between a wind farm and a power grid

机译:用于减轻风电场与电网之间的公共耦合点处的三相电流的电气不平衡的系统和方法

摘要

A system is provided for mitigating an electric unbalance of a three-phase current at a Point of Common Coupling being located between a wind farm having a plurality of wind turbines and a power grid. The system includes a measurement device and a central wind farm controller. The measurement device measures the electric unbalance at the Point of Common Coupling and provides a measurement signal being indicative for the measured electric unbalance. The central wind farm controller is coupled to the measurement device and controls the operation of the plurality of wind turbines. In response to the measurement signal the central wind farm provides a control signal for mitigating the electric unbalance at the Point of Common Coupling. Also provided is a corresponding method for mitigating an electric unbalance of a three-phase current and a computer program for controlling and/or for carrying out the mentioned method.
机译:提供一种用于减轻位于公共耦合点处的三相电流的电不平衡的系统,该公共耦合点位于具有多个风力涡轮机的风电场与电网之间。该系统包括测量设​​备和中央风电场控制器。该测量装置在公共耦合点处测量电不平衡,并提供指示所测得的电不平衡的测量信号。中央风电场控制器耦合到测量装置,并控制多个风力涡轮机的操作。响应于测量信号,中央风电场提供控制信号以减轻公共耦合点的电不平衡。还提供了用于减轻三相电流的电不平衡的相应方法以及用于控制和/或执行所提到的方法的计算机程序。

著录项

  • 公开/公告号US8880228B2

    专利类型

  • 公开/公告日2014-11-04

    原文格式PDF

  • 申请/专利权人 SATHEES KUMAR;

    申请/专利号US201213360874

  • 发明设计人 SATHEES KUMAR;

    申请日2012-01-30

  • 分类号G05D3/12;G05D5;G05D9;G05D11;G05D17;F03D9;H02P9/04;H02J3/38;H02J3/26;

  • 国家 US

  • 入库时间 2022-08-21 16:02:18

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号