首页> 外国专利> System and Method for Loading and storing CNG aboard a Freighter Ship and for download, with the system of CNG

System and Method for Loading and storing CNG aboard a Freighter Ship and for download, with the system of CNG

机译:CNG系统用于在货船上装载和存储CNG并进行下载的系统和方法

摘要

A system for charging and storing CNG aboard a Ship and to download it from the same includes Loading Facility CNG CNG for loading aboard the vessel, storage facilities to store the CNG CNG Loaded on board the vessel pressure and temperature of storage n Ominales and Unloading facilities for downloading the CNG CNG in a delivery Point.The delivery point requires that the CNG is downloaded to a pressure and temperature generally different from the pressure and temperature of storage.Therefore, the unloading facilities include a CNG CNG CNG heater to heat the download before unloading Valve and lamination to allow the download of CNG to expand the storage pressure of the pressure drop. You can also provide a Compressor to compress the CNG that otherwise would not be delivered spontaneously.
机译:一种用于在船上装载和存储CNG并从中下载的系统,包括:装载设施CNG CNG,用于在船上装载;存储设施,用于存储CNG CNG。装载在船上的压力和存储温度n零售和卸载设施用于在交付点下载CNG CNG。交付点要求将CNG下载到通常与存储的压力和温度不同的压力和温度。因此,卸载设备包括CNG CNG CNG加热器,用于在下载之前加热下载卸荷阀和叠片允许CNG的下载以扩大存储压力的压降。您还可以提供一个Compressor来压缩CNG,否则压缩包将不会自发传送。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号