首页>
外国专利>
HIGH RATE STIMULATION METHOD FOR DEEP, LARGE BORE COMPLETIONS
HIGH RATE STIMULATION METHOD FOR DEEP, LARGE BORE COMPLETIONS
展开▼
机译:深部大口径完井的高速模拟方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
A method of servicing a wellbore comprising inserting a first tubing memberhaving a flowbore into the wellbore,wherein a manipulatable fracturing tool, or a component thereof, is coupled tothe first tubing member and wherein the manipulatablefracturing tool comprises one or more ports configured to alter a flow offluid through the manipulatable fracturing tool, positioningthe manipulatable fracturing tool proximate to a formation zone to befractured, manipulating the manipulatable fracturingtool to establish fluid communication between the flowbore of the first tubingmember and the wellbore, introducing a first componentof a composite fluid into the wellbore via the flowbore of the first tubingmember, introducing a second component of thecomposite fluid into the wellbore via an annular space formed by the firsttubing member and the wellbore, mixing the first componentof the composite fluid with the second component of the composite fluid withinthe wellbore, and causing a fracture toform or be extended within the formation zone.
展开▼