首页> 外国专利> METHOD FOR MAKING WATERPROOFING SHEET INTEGRATED WITH CONCRETE LINING IN TUNNEL AND TUNNEL CONSTRUCTION METHOD

METHOD FOR MAKING WATERPROOFING SHEET INTEGRATED WITH CONCRETE LINING IN TUNNEL AND TUNNEL CONSTRUCTION METHOD

机译:隧道混凝土衬砌一体化防水板的制作方法及隧道施工方法

摘要

A waterproof sheet constructed to be integrated with a concrete lining in a tunnel between a shotcrete layer of an inner wall of the tunnel and the concrete lining is disclosed. The waterproof sheet includes a synthetic resin sheet; a non-woven fabric intermittently connected to the upper part of the synthetic resin sheet by point or line welding; a fixed wing attached to the non-woven fabric to be fixed to a shotcrete lining by a nail driven to the shotcrete layer; and a non-woven fabric thin film formed on the outer surface of the synthetic resin sheet with a thickness thinner than the synthetic resin sheet to integrate the concrete lining and the waterproof sheet when the concrete lining is constructed.
机译:公开了一种防水片,该防水片构造成与隧道的内壁的喷射混凝土层和混凝土内衬之间的隧道中的混凝土内衬成为一体。防水片包括合成树脂片;和通过点焊或线焊断续地连接到合成树脂片的上部的无纺布;固定翼,该翼固定在无纺布上,并通过打入喷浆层的钉子固定在喷浆衬里上;在合成树脂片材的外表面上形成厚度比合成树脂片材薄的无纺布薄膜,以在构造混凝土衬片时将混凝土衬片和防水片一体化。

著录项

  • 公开/公告号KR101336449B1

    专利类型

  • 公开/公告日2013-12-04

    原文格式PDF

  • 申请/专利权人 CHUNG KYUNG SON;KIM CHANG YOUNG;

    申请/专利号KR20130052394

  • 发明设计人 KIM CHANG YOUNG;CHUNG KYUNG SON;

    申请日2013-05-09

  • 分类号E21D11/38;B32B27/08;

  • 国家 KR

  • 入库时间 2022-08-21 15:44:08

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号