首页> 外国专利> METHOD OF PRE-SUPPORTED TUNNEL COSTRUCTED IN A SOFT GROUND

METHOD OF PRE-SUPPORTED TUNNEL COSTRUCTED IN A SOFT GROUND

机译:软土地基上预支撑隧道的方法

摘要

The present invention relates to a method of constructing a pre-supported tunnel installed in soft grounds for designing and building a tunnel in soft grounds where soil is shallow in an entrance and an exit of the tunnel and a downtown tunnel. According to the present invention, a method of constructing a pre-supported tunnel installed in soft grounds comprises: a step for installing multiple pre-supported materials designed for penetrating a pre-supported material into an outside of right and left to the longitudinal direction of a tunnel plan cross section, and into the depth required for the bottom of the tunnel from the top of the ground to the transverse direction for cutting off or supporting the pre-supported material before a tunnel is excavated in a ground surface; a step for excavating a pre-supported tunnel plan cross section; a step for removing the pre-supported material by cutting the pre-supported material in the length necessary for installing a bearing plate after installing a shotcrete and a steel rib; and a step for re-attaching the shotcrete for coating after installing the bearing plate. A traverse arch and a longitudinal arching are secured while being excavated at the same time according to a pre-supported material which is pre-constructed before excavation. Since the pre-supported material is installed from the ground surface to a lower part of the bottom of the tunnel as a column, the ground of an upper part of the tunnel is supported as a column, and a working face is stabilized and the ground of a lower part is cut off. The tunnel is excavated more securely without an unsupported state generated in excavation to a traditional NATM. Since relaxation of the foundation can be minimized, a reduction amount of ground strength of the foundation is decreased.
机译:本发明涉及一种建造安装在软土地上的预支撑隧道的方法,用于在隧道和市区隧道的入口和出口处土壤较浅的软土地上设计和建造隧道。根据本发明,一种构造安装在软土地基中的预支撑隧道的方法包括:用于安装多个预支撑材料的步骤,所述多个预支撑材料被设计成用于将预支撑材料穿透到左右纵向的外侧。隧道平面横截面,从地面顶部到横向,直至隧道底部所需的深度,以在将隧道开挖到地面之前切断或支撑预支撑材料;开挖预先支撑的隧道平面横截面的步骤;在安装喷射混凝土和钢肋之后,通过将预支撑材料切割成安装轴承板所需的长度来去除预支撑材料的步骤;安装轴承板后,重新安装喷射混凝土的步骤。根据在开挖之前预先构造的预支撑材料,在同时开挖时确保横拱和纵拱。由于预支撑材料以圆柱状从地面安装到隧道底部的下部,因此,隧道的上部地面以圆柱状支撑,并且工作面稳定并且地面下部的一部分被切断。隧道的开挖更安全,而传统的NATM开挖不会产生无支撑状态。由于可以最小化地基的松弛,所以减少了地基的地面强度的降低量。

著录项

  • 公开/公告号KR20140007309A

    专利类型

  • 公开/公告日2014-01-17

    原文格式PDF

  • 申请/专利权人 HYUN E&C;SEO DONG HYUN;

    申请/专利号KR20130157387

  • 发明设计人 SEO DONG HYUN;

    申请日2013-12-17

  • 分类号E21D9/04;

  • 国家 KR

  • 入库时间 2022-08-21 15:43:53

相似文献

  • 专利
  • 外文文献
  • 中文文献