首页>
外国专利>
METHOD FOR CONSTRUCTING ARTIFICIAL SUBMARINE RIDGE AND ARTIFICIAL SUBMARINE RIDGE
METHOD FOR CONSTRUCTING ARTIFICIAL SUBMARINE RIDGE AND ARTIFICIAL SUBMARINE RIDGE
展开▼
机译:人工海底脊线和人工海底脊线的构造方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
A plurality of block groups are manufactured by connecting a plurality of block bodies (10) to have a ring shape by inserting, into the through hole, a rope/wire penetrating a through hole. The length of the rope/wire is set so that the average of the length of the rope/wire between block bodies is 0.1 to 0.4 times of the length of a side of a block body. The block groups connected by the rope/wire with the predetermined length are piled up on seabed by dropping the block groups on the surface of the sea to at least make a part of the artificial submarine ridge with a roughly conical shape. The artificial submarine ridge is arranged by straightly overlapping a plurality of conical structures in a direction of blocking of the flow of sea water. The projected area (S1) of the artificial submarine ridge in a direction of flowing of sea water is set into 1.6 to 8 times of the projected area (S2) of the artificial submarine ridge in a direction of blocking the flow of sea water.;COPYRIGHT KIPO 2014;[Reference numerals] (AA) Flow
展开▼