DOUBLE SHIP MOORING METHOD WITHIN QUAY WALL

机译:码头墙内的双船系泊方法

摘要

The present invention relates to a ship mooring method and, in more detail, to a double ship mooring method within a quay wall capable of enhancing the usability of the quay wall by mooring two ships within the quay wall and performing a quay wall work. The double ship mooring method within the quay wall according to the present invention comprises the following steps: a first ship berthing step where a first ship comes alongside the quay wall on which fenders are installed; a first ship opening part forming step where opening parts are formed on both sides of the first ship which has come alongside the quay wall in the first ship berthing step; a fender coupling step where the fenders are coupled on one side of the first ship forming the opening parts on both sides in the first ship opening part forming step; a second ship berthing step where a second ship comes alongside the first ship in the same direction of the first ship on whose one side the fenders are coupled in the fender coupling step; a second ship opening part forming step where opening parts are formed on one side, adjacent to the first ship, of the second ship which has come alongside the first ship in the second ship berthing step; and a platform installation step where platforms are installed between the opening parts of the second ship, formed in the second ship opening part forming step, and the opening parts of the first ship adjacent to those of the second ship, and on the remaining opening parts of the first ship.;COPYRIGHT KIPO 2014;[Reference numerals] (S1) First ship berthing step; (S2) First ship opening part forming step; (S3) Fender coupling step; (S4) Second ship berthing step; (S5) Second ship opening part forming step; (S6) Platform installation step
机译:本发明涉及一种船舶系泊方法,并且更具体地涉及一种在码头壁内的双船系泊方法,该方法能够通过在码头壁内系泊两艘船并执行码头壁工作来增强码头壁的可用性。根据本发明的在码头壁中的双船系泊方法包括以下步骤:第一船停​​泊步骤,其中第一艘船与安装有护舷板的码头壁并排;第一船舶开口部形成步骤,在第一船舶靠泊步骤中,在与码头壁并排的第一船舶的两侧形成开口部。翼子板连接步骤,其中,在第一船体开口部形成步骤中,翼子板在第一船体的一侧上形成在两侧上的开口部。第二轮靠泊步骤,其中第二轮在第一和第二轮船的护舷器连接步骤中与第一轮船的同一方向并排在第一轮船的一侧;第二船开口部形成步骤,其中在第二船停泊步骤中,在与第一船并排的第二船的与第一船相邻的一侧上形成开口部;平台安装步骤,其中平台被安装在第二船舶开口部分形成步骤中形成的第二船舶的开口部分和与第二船舶的开口相邻的第一船舶的开口部分之间,并在其余的开口部分上安装平台COPYRIGHT KIPO 2014; [参考数字](S1)第一艘船停泊; (S2)第一开船部形成步骤; (S3)挡泥板连接步骤; (S4)第二轮靠泊步骤; (S5)第二开船部形成步骤; (S6)平台安装步骤

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号