METHOD FOR CONSTRUCTING OF PRESTRESSED CONCRETE COMPOSITE GIRDER WHICH COMBINED TENSION APPLIED TYPE

机译:组合拉力形式的预应力混凝土组合梁的施工方法。

摘要

The present invention relates to: a method of continuous construction of a prestressed concrete composite girder adopting a composite tension method to be able to easily secure working space because of working for fixing continuous PC steel wire in cross beams in second tension as efficiently decreasing negative moment after manufacturing a PSC girder adopting a pretension method, and applying second PC steel wire and continuous PC steel wire at the same time in a continuation process, to effectively resist a shearing force applied to a bridge as a shearing key part is formed on a binding face, and to structurally stabilize point parts because tension can be controlled in or before a step for placing an upper-part structure of the bridge by a tension controlling means; and to a concrete composite girder bridge constructed thereby.
机译:本发明涉及:采用复合张紧法连续施工预应力混凝土组合梁的方法,因为通过将第二张张紧力将连续的PC钢丝固定在横梁中,从而有效地减小了负力矩,从而能够容易地确保工作空间。在采用预张紧方法制造PSC大梁之后,在连续过程中同时施加第二PC钢丝和连续PC钢丝之后,由于在接合处形成了剪切关键部位,因此有效地抵抗了施加到桥梁的剪切力因为可以通过张力控制装置在放置桥的上部结构的步骤中或之前控制张力,所以在表面上和在结构上稳定点部。并由此建造的混凝土复合梁桥。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号