首页> 外国专利> Method for establishing gravity foundation for offshore-wind power plant, involves lowering heavy weight body in shallow form into sea base by fluidization and lateral pushing of ground below base of heavy weight body

Method for establishing gravity foundation for offshore-wind power plant, involves lowering heavy weight body in shallow form into sea base by fluidization and lateral pushing of ground below base of heavy weight body

机译:为海上风力发电站建立重力基础的方法,涉及通过流化和将地面横向推入重物基体下方,将浅重物降入海底。

摘要

The method involves partially or totally lowering a heavy weight body, essentially a ring body (10) in shallow form into the sea base after the attachment on the sea base by fluidization and lateral pushing of the ground below the base of the heavy weight body. A soft layer is relocated with a water injection process, initially before attachment of the heavy weight body on the location of the wind energy plant. The fluidization takes place by high pressure nozzle in base area of heavy weight body, and supply of fluid under pressure takes place by a line in a hollow support of grid-like shaft. An independent claim is included for a method for producing a gravity foundation.
机译:该方法包括通过流化和将地面横向推到重物基体下方而将其附着在海基体上之后,部分或全部地将重物,基本上是浅形式的环形体(10)降低到海基中。首先在将重物固定到风能设备的位置之前,先通过注水过程将软层重新放置。在重物的基部区域中通过高压喷嘴进行流化,并且在压力下通过网格状轴的中空支架中的管线进行流体的供应。包括独立权利要求,用于生产重力基础。

著录项

  • 公开/公告号DE102012018653A1

    专利类型

  • 公开/公告日2014-03-20

    原文格式PDF

  • 申请/专利权人 WERNER MOEBIUS ENGINEERING GMBH;

    申请/专利号DE20121018653

  • 发明设计人 MOEBIUS WERNER;

    申请日2012-09-20

  • 分类号E02D27/52;

  • 国家 DE

  • 入库时间 2022-08-21 15:37:55

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号