首页> 外国专利> Network planning and management

Network planning and management

机译:网络规划与管理

摘要

For determining the topology of a network section (1) of an AC network (4) having a network connection point (3), at least one strand (5-9) outgoing from the network connection point (3) with a plurality of energy consumption units (12, 13) and / or energy generation units ( 14/15, 16/18, 17/19, 20/21) and at least one measuring point in which at least one string (5-9), are variations of connection performance of at least one of the plurality of energy consumption units (12, 13) and / or Power generation units (14/15; 16/18; 17/19; 20/21) and variations of the mains voltage measured at the at least one measuring point of the network section (1). Then, dependencies of the variations of the line voltage at the at least one measurement point on the variations of the connection powers of at least some of the plurality of power consumption units (12, 13) and / or power generation units (14/15; 16/18; 17/19; 20/21) certainly.
机译:为了确定具有网络连接点(3)的AC网络(4)的网络部分(1)的拓扑,从网络连接点(3)引出的至少一根股线(5-9)具有多种能量消耗单位(12、13)和/或能量生成单位(14 / 15、16 / 18、17 / 19、20 / 21)和至少一个测量点,其中至少一根字符串(5-9)是变化的多个能耗单元(12、13)和/或发电单元(14/15; 16/18; 17/19; 20/21)中的至少一个的连接性能的变化以及在网络部分(1)的至少一个测量点。然后,至少一个测量点处的线电压的变化对多个电力消耗单元(12、13)和/或发电单元(14/15中的至少一些)的连接功率的变化的依赖性。 ; 16/18; 17/19; 20/21)。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号