首页> 外国专利> METHOD AND SYSTEM FOR SUPPLYING AT LEAST ONE WORKING UNIT IN SUB-COOLING CRYOGENIC LIQUID

METHOD AND SYSTEM FOR SUPPLYING AT LEAST ONE WORKING UNIT IN SUB-COOLING CRYOGENIC LIQUID

机译:在亚冷却低温液体中提供至少一个工作单元的方法和系统

摘要

A method of supplying cryogenic liquid subcooled from at least one station (P, P1, P2 ...) performing machining operations, from a storage tank (10), which reservoir contains, under a storage pressure greater than atmospheric pressure, the cryogenic fluid in the liquid phase at the bottom of the tank and in the gaseous phase at the top of the tank, said tank being adapted to supply said station (P) with liquid drawn from the bottom of the tank (10), as well as to be supplied from the outside with fluid, characterized in that: - one has at least one heat exchanger, immersed in at least one bath of said cryogenic liquid (20), - one carries out the controlling (3, 4) the level of the or each bath at a determined level; - It is passed through the or each heat exchanger cryogenic liquid from the storage tank (10) before its arrival at (s) post (s) machining; - The pressure of the cryogenic liquid from the or each immersed exchanger is adjusted (1, 6, 1 2, 13, 61, 62 ...) before it arrives at the corresponding machining station.
机译:一种从执行加工操作的至少一个站(P,P1,P2 ...)中过冷的低温液体的供给方法,是从储罐(10)中供入,该储罐在大于大气压的储藏压力下包含低温流体。在罐底部的液相中和在罐顶部的气相中,所述罐适于向所述工位(P)供应从罐(10)的底部汲取的液体,并且从外部向其供应流体,其特征在于:-一个具有至少一个热交换器,浸没在所述低温液体(20)的至少一个浴中,-一个进行控制(3,4)的液位。或每个浴池处于确定的水平; -在到达加工后,使液体从储罐(10)穿过热交换器或每个热交换器的低温液体; -在到达相应的加工工位之前,应调节来自每个或每个浸没式交换器的低温液体的压力(1、6、1、2、13、61、62 ...)。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号