TEMPORARY RECEIVING METHOD FOR VERTICAL LOAD OF ASEISMIC BASE ISOLATION RETROFITTING CONSTRUCTION, AND TEMPORARY RECEIVING STRUCTURE THEREFOR

机译:隔震基础隔震改造施工竖向荷载的临时接纳方法及临时接纳结构

摘要

PROBLEM TO BE SOLVED: To solve the problems in which conventional temporary receiving methods for vertical load of aseismic base isolation retrofitting construction require a curing period for concrete and become longer in construction period, and are large in cost for removal thereof.;SOLUTION: In a temporary receiving method for vertical load of aseismic base isolation retrofitting construction that crimps a temporary receiving member which temporarily receives axial force of a building by a crimping member penetrating an existing column of the building so as to temporarily receive the axial force applied to the existing column by the temporary receiving member and a jack mounted on the temporary receiving member when an aseismic base isolation device is installed at a place where a part of the existing column is cut, the temporary receiving member is formed in advance at a factory in the form of precast concrete brackets 3a, 3b in a vertically or horizontally divided state to be installed on the column.;COPYRIGHT: (C)2015,JPO&INPIT
机译:要解决的问题:为了解决传统的临时抗震基础隔震改造工程临时接收方法需要混凝土的养护期,并且施工期更长,并且拆除成本高的问题。一种用于抗震基础隔离改造结构的垂直载荷的临时接收方法,该方法通过压接穿过建筑物的现有立柱的压接构件来压接临时接收建筑物的轴向力的临时接收构件,从而临时接收施加到现有构件上的轴向力当在一部分现有的立柱被切断的地方安装了抗震基座隔离装置时,通过临时接收部件和安装在临时接收部件上的千斤顶来形成支柱,临时接收部件以如下形式在工厂预先形成:垂直或水平分割状态的预制混凝土托架3a,3b的插入COPYRIGHT:(C)2015,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号