首页> 外国专利> Cooling tower, and the eliminator method installation in the cooling tower

Cooling tower, and the eliminator method installation in the cooling tower

机译:冷却塔以及在冷却塔中安装的消除方法

摘要

PROBLEM TO BE SOLVED: To provide an installation method of an eliminator of a cooling tower, which facilitates inspection and cleaning of the eliminator and a filler inside the cooling tower.;SOLUTION: The eliminator 21 is bridged in a groove shape (groove bottom 21a and groove side parts 21b) between upper ends 14a, 14a of side surfaces on an inner surface side (inner side of the tower) of a pair of right and left fillers 14 in a tower inner space 19. Air 17 passes through the eliminator after passing through the fillers 14.;COPYRIGHT: (C)2012,JPO&INPIT
机译:解决的问题:提供一种冷却塔的除水器的安装方法,该方法便于检查和清洁冷却塔内的除水器和填充物。解决方案:除水器21桥接成槽形(槽底21a)在塔内部空间19中的左右一对填充物14的内表面侧(塔的内侧)的侧面的上端14a,14a之间具有槽侧部21b)。通过填料14 .;版权所有:(C)2012,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号