首页>
外国专利>
power system load frequency control system and program
power system load frequency control system and program
展开▼
机译:电力系统负荷频率控制系统及程序
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To suppress generation of the distribution rest of area demand electric power when an electric generator has small adjustment reserve power or when an operation system is partial.;SOLUTION: Area demand electric power distribution means in an embodiment includes time width adjustment means. The time width adjustment means calculates the adjustment reserve power of a high-speed machine of the electric generator and the adjustment reserve power of a low-speed machine of the electric generator. The time width adjustment means increases a time width of a frequency band that the high-speed machine takes partial charge of and decreases a time width of a frequency band that the low-speed machine takes partial charge of when the adjustment reserve power of the high-speed machine is a threshold or larger than the adjustment reserve power of the low-speed machine. The time width adjustment means increases the time width of the frequency band that the low-speed machine takes partial charge of and decreases the time width of the frequency band that the high-speed machine takes partial charge of when the adjustment reserve power of the low-speed machine is the threshold or larger than the adjustment reserve power of the high-speed machine.;COPYRIGHT: (C)2013,JPO&INPIT
展开▼