PROBLEM TO BE SOLVED: To suppress generation of the distribution rest of area demand electric power when an electric generator has small adjustment reserve power or when an operation system is partial.;SOLUTION: Area demand electric power distribution means in an embodiment includes time width adjustment means. The time width adjustment means calculates the adjustment reserve power of a high-speed machine of the electric generator and the adjustment reserve power of a low-speed machine of the electric generator. The time width adjustment means increases a time width of a frequency band that the high-speed machine takes partial charge of and decreases a time width of a frequency band that the low-speed machine takes partial charge of when the adjustment reserve power of the high-speed machine is a threshold or larger than the adjustment reserve power of the low-speed machine. The time width adjustment means increases the time width of the frequency band that the low-speed machine takes partial charge of and decreases the time width of the frequency band that the high-speed machine takes partial charge of when the adjustment reserve power of the low-speed machine is the threshold or larger than the adjustment reserve power of the high-speed machine.;COPYRIGHT: (C)2013,JPO&INPIT
机译:要解决的问题:当发电机的调整储备功率较小或操作系统为部分运行时,抑制区域需求电力的分配剩余部分的产生。解决方案:在一个实施例中,区域需求电力分配装置包括时间宽度调整手段。时间宽度调节装置计算发电机的高速机的调节储备功率和发电机的低速机的调节储备功率。时间宽度调节装置在高功率的调节储备功率增加时,增加高速机部分充电的频带的时间宽度,并减小低速机部分充电的频带的时间宽度。低速机的阈值或大于低速机的调整储备功率。时间宽度调整装置在低位的调整储备功率时,增加低速机部分充电的频带的时间宽度,并减小高速机部分充电的频带的时间宽度。速度机是阈值或大于高速机的调整储备功率。;版权所有:(C)2013,日本特许厅&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号