首页> 外国专利> And it is supported by the fulcrum of the pier, in the central portion in the width direction of the floor slab does not have an opening through in the vertical direction girder bridge and its construction method

And it is supported by the fulcrum of the pier, in the central portion in the width direction of the floor slab does not have an opening through in the vertical direction girder bridge and its construction method

机译:并且,在墩台的支点支撑下,在楼板的宽度方向的中央部在上下方向上没有贯通的梁桥及其施工方法

摘要

PROBLEM TO BE SOLVED: To provide a bridge and a construction method of the bridge restraining divergent vibration within checking wind speed as a countermeasure for improving windproof stability in bridge construction before pavement is provided on a floor slab.;SOLUTION: A plurality of center barriers 3 composed of center wall bodies spaced along a bridge axis direction are provided at the upper face center part of the floor slab as a vibration control device during construction.;COPYRIGHT: (C)2010,JPO&INPIT
机译:解决的问题:提供一种桥梁以及一种在风速控制内抑制发散振动的桥梁的施工方法,以作为在地板上设置人行道之前提高桥梁施工的防风稳定性的对策;解决方案:多个中心屏障在楼板的上表面中心部分设置有由沿桥轴线方向隔开的中心壁体构成的3作为振动控制装置。版权所有:(C)2010,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号