首页> 外国专利> Solidification completion position of continuous casting slab detection method and a control method .

Solidification completion position of continuous casting slab detection method and a control method .

机译:连铸板坯凝固结束位置的检测方法及控制方法。

摘要

PROBLEM TO BE SOLVED: To exactly detect the solidification completion position of a continuous cast piece by a simple method while suppressing equipment costs.;SOLUTION: When continuously casting molten steel by continuously drawing out a cast piece while supporting the cast piece by using a roll segment 15 which is embedded with a plurality of pairs of cast piece support rolls 7, and has four tie rods 17 for connecting an upper frame 16' and a lower frame 16, an amount of the warpage of a disc spring 19 which is attached to the four tie rods for connecting the upper frame and the lower frame of the roll segment and prevents an excess load is measured in a state that an under-pressure gradient of the roll segment is set not smaller than 0.3 mm/m, and when the measured amount of the warpage of the disc spring reaches 0.3 mm or larger, a vibration stroke of the warpage is not smaller than 0.05 mm, and a vibration cycle is within ±10% of an integer multiple of a ratio (R/Vc) between a roll pitch R (mm) of the cast piece support roll and a cast piece draw-out speed Vc (mm/min), it is determined that the solidification of the cast piece is completed in a region of the roll segment.;COPYRIGHT: (C)2012,JPO&INPIT
机译:解决的问题:在抑制设备成本的同时,通过简单的方法精确地检测连续铸件的凝固完成位置;解决方案:当通过用辊支撑铸件的同时连续抽出铸件来连续铸造钢水时分段15,其嵌入有多对铸件支撑辊7,并具有四个用于连接上框架16'和下框架16的拉杆17,其附接有碟形弹簧19的翘曲量在将辊段的负压梯度设置为不小于0.3 mm / m的状态下以及当盘簧的翘曲的实测值达到0.3mm以上,翘曲的振动行程为0.05mm以上,振动周期在比率(R / Vc)的整数倍的±10%以内。 tw根据铸件支撑辊的辊间距R(mm)和铸件抽出速度Vc(mm / min),确定铸件的凝固在辊段的区域中完成。 :(C)2012,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号