首页> 外国专利> Crash protection engineering for crane truck

Crash protection engineering for crane truck

机译:起重机的防撞工程

摘要

PROBLEM TO BE SOLVED: To provide a fall prevention work for a crane truck which can easily execute the erection and storage of guard posts and locking work.;SOLUTION: First rigging fastening parts 29/34a, 34b/41 integrated with the guard posts 20 to 22 are provided at a peripheral position of a lower end of each of the guard posts 20 to 22 positioned at one side of a straight line connecting pivot pins 17 to 19 in both states of throwing down the guard posts 20 to 22 in parallel to a main boom 12 and standing them up vertically. Also, second rigging fastening parts 30/35a, 35b/42 are provided at a symmetrical position of the first rigging fastening parts. The first rigging fastening parts are connected to each other, the second rigging fastening parts are connected to each other, or the first rigging fastening parts are connected to the second rigging fastening parts, respectively, in the mutually adjacent guard posts 20, 21, and the guard posts 21, 22 with riggings 46 to 49, thereby working with the swing of the guard post 20 on the base side and swinging the other guard posts 21, 22 simultaneously.;COPYRIGHT: (C)2012,JPO&INPIT
机译:解决的问题:为起重车提供防坠落工作,可以轻松执行竖立和存放护柱并进行锁定工作。;解决方案:首先将与护柱20集成的索具29 / 34a,34b / 41进行索具安装在将护柱20至22平行地向下倾斜的两种状态下,护柱20至22设置在每个护柱20至22的下端的外围位置,该护柱位于连接枢轴销17至19的直线的一侧。主吊臂12并使其垂直竖立。而且,第二索具紧固部30 / 35a,35b / 42设置在第一索具紧固部的对称位置处。在彼此相邻的护柱20、21和11中,第一索具紧固部件彼此连接,第二索具紧固部件彼此连接,或者第一索具紧固部件与第二索具紧固部件连接。护柱21、22带有索具46至49,从而使护柱20在基部侧摆动,同时使其他护柱21、22摆动。版权所有:(C)2012,JPO&INPIT

著录项

  • 公开/公告号JP5657397B2

    专利类型

  • 公开/公告日2015-01-21

    原文格式PDF

  • 申请/专利权人 株式会社加藤製作所;

    申请/专利号JP20110000862

  • 发明设计人 柿崎 剛太;

    申请日2011-01-05

  • 分类号B66C15/00;B66C23/88;

  • 国家 JP

  • 入库时间 2022-08-21 15:28:31

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号